Substation · England, United Kingdom

The Green Primary

The Green Primary is a 22 kV primary substation in England, United Kingdom, with 0 MVA of demand headroom and 13.5 MW of generation headroom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom0 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom13.5 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 10 / 12.5MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimary substationSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromNorth Hyde BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)None (green on the heat map)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage22 kV (levels 22, 6.6 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.5033, -0.3818SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 356 power plants (112 operating, 996 MW), 159 data centers (1 operating, 88 MW), 83 grid connections (44 operating, 475 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Colt London 4Data center——1.1 km
Virtus LONDON2Data center——1.8 km
Western International MarketPower plant1.7 MWOperating1.8 km
Data center, England (OSM way 838773806)Data center——2.0 km
Brentford F C Training Ground 100 grid connectionGrid connection120 MWPlanned2.8 km
North Hyde Sub STN grid connectionGrid connection9.5 MWOperating2.9 km
Harlington QuarryPower plant3 MWCancelled3.0 km
Mogden STWPower plant5.8 MWOperating5.3 km
Heathrow Flight Path grid connectionGrid connection1.15 MWPlanned5.4 km

Grid operator and place

More from Southern Electric Power Distribution plc

Candidate sites around this substation

1 site of land near The Green Primary has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in England

All 1666 substations in England, United Kingdom