RARE CONTEXT Request research

Substation · England, United Kingdom

Stanford 11kV Substation

Stanford 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 6.2 MVA of demand headroom and 8.1 MVA of generation headroom, operated by South Eastern Power Networks plc (UK Power Networks, South East England licence area).

Map: where Stanford 11kV lies
51.1082, 1.0423 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom6.2 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom8.1 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity15.1 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.1082, 1.0423UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 177 power plants (64 operating, 4,479 MW), 133 grid connections (87 operating, 1,512 MW), 4 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Link Park Industrial EstatePower plant45 MWCancelled3.1 km
Harringe Brooks Wind ParkPower plant15 MWPlanned3.3 km
Park Farm grid connectionGrid connection49.9 MWPlanned3.9 km
Forty Acre Wood, The Street - Battery Energy Storage SystemPower plant300 MWCancelled3.9 km
Sellindge Solar Farm grid connectionGrid connection10 MWOperating4.7 km
Bank Farm Solar grid connectionGrid connection99.9 MWPlanned7.7 km
The Bunker - South East Data CentreData center——25 km
Richborough Connection ProjectTransmission line—Permitted27 km
Sota DatacentreData center——32 km

Grid operator and place

More from South Eastern Power Networks plc

Other substations in England

All 2633 substations in England, United Kingdom

Data on this page