Smeeth 11kV Substation

Smeeth 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 2.2 MVA of demand headroom and 1.1 MVA of generation headroom, operated by South Eastern Power Networks plc (UK Power Networks, South East England licence area).

Map: where Smeeth 11kV lies
51.1062, 0.9499 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom2.2 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom1.1 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity3.8 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.1062, 0.9499UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 184 power plants (68 operating, 4,500 MW), 144 grid connections (93 operating, 1,561 MW), 4 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Stonestreet Green - Solar Farm & Battery StoragePower plant99.9 MWPermitted0.6 km
Stonestreet Green SolarPower plant99.9 MWPermitted1.0 km
Bank Farm Solar grid connectionGrid connection99.9 MWPlanned1.5 km
Sellindge Solar Farm grid connectionGrid connection10 MWOperating1.9 km
Sellindge Substation, Church Lane - Battery StoragePower plant57 MWCancelled2.0 km
Park Farm grid connectionGrid connection49.9 MWPlanned3.8 km
Sota DatacentreData center——28 km
The Bunker - South East Data CentreData center——30 km
Richborough Connection ProjectTransmission line—Permitted31 km