Shrub End Primary 11kV Substation

Shrub End Primary 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 7.9 MVA of demand headroom and 9.8 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Shrub End Primary 11kV lies
51.8692, 0.8655 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom7.9 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom9.8 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity23 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8692, 0.8655UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 227 power plants (95 operating, 4,503 MW), 179 grid connections (110 operating, 1,754 MW), 2 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Colchester Borough Homes, Batch 3, Phase 1. grid connectionGrid connection1.02 MWOperating1.4 km
Bellhouse SouthPower plant3.9 MWOperating2.3 km
Bellhouse LFG grid connectionGrid connection6.1 MWOperating2.6 km
Layer Farm - Solar FarmPower plant49 MWOperating2.6 km
Birch Road grid connectionGrid connection70 MWOperating2.8 km
Bellhouse Pit Landfill SchemePower plant2.7 MWOperating3.0 km
Bramford to TwinsteadTransmission line—Permitted15 km
CityFibre CabinetsData center——37 km
Imperium 315Data center——41 km

Grid operator and place

Grid connections attached to this substation

More from Eastern Power Networks plc

Other substations in England

All 2633 substations in England, United Kingdom

Data on this page