RARE CONTEXT Request research

Substation · England, United Kingdom

Rye 11kV

Rye 11kV is an 11 kV primary substation in England, United Kingdom, with 1.9 MVA of demand headroom and 4.3 MVA of generation headroom, operated by South Eastern Power Networks plc (UK Power Networks, South East England licence area).

Map: where Rye 11kV lies
50.9613, 0.7313 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom1.9 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom4.3 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity12.6 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates50.9613, 0.7313UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 158 power plants (59 operating, 1,186 MW), 118 grid connections (75 operating, 883 MW) and 3 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Little Cheyne Court Windfarm grid connectionGrid connection64 MWOperating6.4 km
Little Cheyne Court Wind FarmPower plant59.8 MWOperating6.6 km
AHS Energy (Combustion)Power plant4.5 MWCancelled9.2 km
Quickbourne Lane grid connectionGrid connection4.4 MWPlanned9.3 km
Agney FarmPower plant8 MWCancelled9.6 km
Sycamore Farm grid connectionGrid connection18 MWOperating11 km
CXD Infrastructure SolutionsData center——38 km
CustodianDC MaidstoneData center——38 km
Sota DatacentreData center——39 km

Grid operator and place

More from South Eastern Power Networks plc

Other substations in England

All 2633 substations in England, United Kingdom

Data on this page