RARE CONTEXT Request research

Substation · England, United Kingdom

Molesey 11kV Substation

Molesey 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 5.6 MVA of demand headroom and 24.6 MVA of generation headroom, operated by South Eastern Power Networks plc (UK Power Networks, South East England licence area).

Map: where Molesey 11kV lies
51.4071, -0.3737 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom5.6 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom24.6 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity22 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.4071, -0.3737UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 328 grid connections (223 operating, 2,073 MW), 316 power plants (108 operating, 2,522 MW), 157 data centers (1 operating, 88 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Hampton WTW grid connectionGrid connection6.9 MWOperating0.5 km
Hampton WTW grid connectionGrid connection5.3 MWOperating0.5 km
Walton WTW PVPower plant1.8 MWOperating1.5 km
Weylands Treatment WorksPower plant6 MWCancelled3.1 km
Sunbury Battery Energy Storage System - Battery Energy Storage SystemPower plant200 MWPermitted4.3 km
Ready - 200MW Battery grid connectionGrid connection200 MWPlanned4.7 km
Verizon UK4Data center——6.4 km
Morgan Stanley Data CentreData center——6.8 km
Stellanor London WestData center——7.0 km

Grid operator and place

More from South Eastern Power Networks plc

Other substations in England

All 2633 substations in England, United Kingdom

Data on this page