Substation · England, United Kingdom

Lee-On-Solent Primary Substation

Lee-On-Solent Primary Substation is a 33 kV primary substation in England, United Kingdom, with 0 MVA of demand headroom and 0 MW of generation headroom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom0 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 12 / 24MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimary substationSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromFareham (Reserve) BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromLovedean GSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels 33, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates50.7994, -1.1946SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Request research

Nearby

Within 50 km of this substation: 218 power plants (100 operating, 1,929 MW), 188 grid connections (110 operating, 970 MW), 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Peel Common Waste Water Treatment WorksPower plant20 MWCancelled2.6 km
Newlands Farm SolarPower plant20.5 MWOperating3.6 km
Newlands Farm grid connectionGrid connection49.9 MWPlanned3.6 km
Fareham Solar 3 grid connectionGrid connection24 MWPlanned3.6 km
Tanners Lane - Battery Energy Storage Facility (Phase One)Power plant40 MWCancelled3.7 km
Battery storage 38 MW grid connection at Fareham Battery StorageGrid connection38 MWOperating4.2 km
ServerHouseData center——5.8 km
ServerhouseData center——8.4 km
AstrohouseData center——8.4 km

Grid operator and place

More from Southern Electric Power Distribution plc

Other substations in England

All 1666 substations in England, United Kingdom