Substation · England, United Kingdom
Lee-On-Solent Primary Substation
Lee-On-Solent Primary Substation is a 33 kV primary substation in England, United Kingdom, with 0 MVA of demand headroom and 0 MW of generation headroom, connected by Southern Electric Power Distribution plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Demand headroom | 0 MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Generation headroom | 0 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Transformers | 2 x 12 / 24MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Level | Primary substation | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Fed from | Fareham (Reserve) BSP | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Fed from | Lovedean GSP | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (offtake) | Full (red on the heat map, limited by upstream thermal capacity) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | Full (red on the heat map, limited by upstream thermal capacity) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV (levels 33, 11 kV) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 50.7994, -1.1946 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Request researchNearby
Within 50 km of this substation: 218 power plants (100 operating, 1,929 MW), 188 grid connections (110 operating, 970 MW), 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Peel Common Waste Water Treatment Works | Power plant | 20 MW | Cancelled | 2.6 km |
| Newlands Farm Solar | Power plant | 20.5 MW | Operating | 3.6 km |
| Newlands Farm grid connection | Grid connection | 49.9 MW | Planned | 3.6 km |
| Fareham Solar 3 grid connection | Grid connection | 24 MW | Planned | 3.6 km |
| Tanners Lane - Battery Energy Storage Facility (Phase One) | Power plant | 40 MW | Cancelled | 3.7 km |
| Battery storage 38 MW grid connection at Fareham Battery Storage | Grid connection | 38 MW | Operating | 4.2 km |
| ServerHouse | Data center | — | — | 5.8 km |
| Serverhouse | Data center | — | — | 8.4 km |
| Astrohouse | Data center | — | — | 8.4 km |
Grid operator and place
More from Southern Electric Power Distribution plc
- Amersham GSPsubstation
- Loudwater BSPsubstation
- Bowerdean Primarysubstation
- Flackwell Heath Primarysubstation
- Well End Primarysubstation
- Wycombe Marsh Primarysubstation
- Axminster GSPsubstation
- Yeovil BSPsubstation
Other substations in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.