Substation · England, United Kingdom

Kennington Primary

Kennington Primary is a substation in England, United Kingdom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom1.19 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers1 x 7.5 / 12.2MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimarySSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromCowley GSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromCowley Local (Reserve) BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)None (green on the heat map)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels 33, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.7061, -1.2361SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 327 power plants (119 operating, 1,753 MW), 248 grid connections (98 operating, 1,093 MW) and 59 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Nuneham Solar grid connectionGrid connection50 MWPlanned0.8 km
Radley College, Kennington Gate - Solar Array & Battery StoragePower plant2 MWPermitted1.1 km
Engine (Combustion / Reciprocating) 11.25 MW grid connection at Cowley LocalGrid connection11.3 MWPlanned1.6 km
Radley College grid connectionGrid connection2.9 MWPlanned1.7 km
Nuneham Courtenay - Solar FarmPower plant49.9 MWPlanned2.1 km
Nuneham Courtenay Solar Farm & Battery Storage FacilityPower plant49.9 MWPermitted2.6 km
University Shared Data CentreData center——6.1 km
AWS Didcot Data CentreData center——10 km
R89Data center——16 km

Grid operator and place

Grid connections attached to this substation

More from Southern Electric Power Distribution plc

Other substations in England

All 1666 substations in England, United Kingdom

Data on this page