Substation · England, United Kingdom
Huntingdon Grid 33kV Substation
Huntingdon Grid 33kV Substation is a 33 kV primary substation in England, United Kingdom, with 51.2 MVA of demand headroom and 61.9 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Demand headroom | 51.2 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Generation headroom | 61.9 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Firm capacity | 114 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Level | Primary substation | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 52.3417, -0.1823 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Nearby
Within 50 km of this substation: 429 power plants (164 operating, 2,861 MW), 213 grid connections (137 operating, 1,901 MW) and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Godmanchester Landfill Site grid connection | Grid connection | 3 MW | Operating | 2.4 km |
| Upwood Airfield grid connection | Grid connection | 20 MW | Operating | 2.5 km |
| Godmanchester | Power plant | 3 MW | Operating | 2.8 km |
| Abbots Ripton Solar Farm (ext.) | Power plant | 3.9 MW | Operating | 3.5 km |
| Cranfield University grid connection | Grid connection | 1.75 MW | Operating | 3.8 km |
| Abbots Ripton Solar Farm | Power plant | 24.7 MW | Operating | 4.3 km |
| West Cambridge Data Centre | Data center | — | — | 23 km |
| Data center, England (OSM way 87850427) | Data center | — | — | 24 km |
| Redcentric Cambridge | Data center | — | — | 26 km |
Grid operator and place
More from Eastern Power Networks plc
- Canvey Primary 11kVsubstation
- Thorley Primary 11kVsubstation
- Peterborough South Grid 11kVsubstation
- Westbury Primary 11kVsubstation
- Laxfield Primary 11kVsubstation
- Fulbourn Grid 33kVsubstation
- Earlham Grid 33kVsubstation
- Hunstanton Primary 11kVsubstation
Candidate sites around this substation
1 site of land near Huntingdon Grid 33kV has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 84 ha brownfield site at RAF Alconbury, Huntingdonshire3.79 km · score 64
Other substations in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.