Substation · England, United Kingdom
Histon Grid 33kV Substation
Histon Grid 33kV Substation is a 33 kV primary substation in England, United Kingdom, with 57.9 MVA of demand headroom and 37.7 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Demand headroom | 57.9 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Generation headroom | 37.7 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Firm capacity | 123 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Level | Primary substation | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 52.2432, 0.1069 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Nearby
Within 50 km of this substation: 359 power plants (150 operating, 2,858 MW), 262 grid connections (168 operating, 2,298 MW) and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| (ANM) Gatehouse Road grid connection | Grid connection | 49.9 MW | Planned | 1.5 km |
| Milton Landfill Gas Generation A grid connection | Grid connection | 2.13 MW | Operating | 2.7 km |
| Milton Landfill Gas Generation B grid connection | Grid connection | 2.12 MW | Operating | 2.7 km |
| Redcentric Cambridge | Data center | — | — | 3.3 km |
| Milton Landfill Site | Power plant | 2 MW | Operating | 3.6 km |
| West Cambridge Data Centre | Data center | — | — | 4.3 km |
| Falcon Park, Wilsons Road - Solar Farm & Battery Energy Storage | Power plant | 26 MW | Planned | 5.4 km |
| Falcon Park, Wilsons Road - Solar Farm & Battery Energy Storage | Power plant | 20 MW | Planned | 5.4 km |
| US Air Force data center, Brandon | Data center | — | — | 35 km |
Grid operator and place
More from Eastern Power Networks plc
- Canvey Primary 11kVsubstation
- Thorley Primary 11kVsubstation
- Peterborough South Grid 11kVsubstation
- Westbury Primary 11kVsubstation
- Laxfield Primary 11kVsubstation
- Fulbourn Grid 33kVsubstation
- Earlham Grid 33kVsubstation
- Hunstanton Primary 11kVsubstation
Candidate sites around this substation
1 site of land near Histon Grid 33kV has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
Other substations in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.