Ewell 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 10.4 MVA of demand headroom and 45.6 MVA of generation headroom, operated by South Eastern Power Networks plc (UK Power Networks, South East England licence area).

Map: where Ewell 11kV lies
51.3496, -0.2503 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom10.4 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom45.6 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity45.8 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.3496, -0.2503UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 342 grid connections (241 operating, 2,196 MW), 334 power plants (118 operating, 3,258 MW), 150 data centers (1 operating, 88 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Cheam WTW 213936 grid connectionGrid connection4.42 MWOperating3.1 km
Digital Realty LHR13Data center——3.5 km
15 Cotswold Rd grid connectionGrid connection2 MWOperating3.9 km
Rushett Lane grid connectionGrid connection30 MWPlanned4.1 km
Rushett Lane - Battery Storage SystemPower plant30 MWCancelled4.5 km
Fair Oak LanePower plant49.9 MWCancelled4.7 km
London’s Queen Elizabeth II reservoirPower plant6.3 MWOperating5.9 km
CapitalLand - CroydenData center——8.7 km
Segro Croydon (Morgan Stanley)Data center——8.8 km