Substation · England, United Kingdom
East Howe Primary
East Howe Primary is a 33 kV primary substation in England, United Kingdom, with 0 MVA of demand headroom and 0 MW of generation headroom, connected by Southern Electric Power Distribution plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Demand headroom | 0 MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Generation headroom | 0 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Transformers | 2 x 15 / 23.7MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Level | Primary substation | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Fed from | Mannington BSP | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Fed from | Redhill BSP | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (offtake) | Full (red on the heat map, limited by substation thermal capacity) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | Full (red on the heat map, limited by upstream thermal capacity) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV (levels 33, 11 kV) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 50.7556, -1.9051 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.
Request researchNearby
Within 50 km of this substation: 227 power plants (103 operating, 855 MW), 172 grid connections (106 operating, 866 MW) and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Waste 7.125 MW grid connection at Alderney | Grid connection | 7.13 MW | Operating | 3.2 km |
| Canford | Power plant | 1 MW | Closed | 3.4 km |
| Woodtown Farm | Power plant | 3.8 MW | Operating | 3.4 km |
| Canford Resource Park- Energy from Waste/CHP | Power plant | 30 MW | Cancelled | 3.5 km |
| Solar 3.62 MW grid connection at Redhill | Grid connection | 3.62 MW | Operating | 3.6 km |
| Canford EFW grid connection | Grid connection | 27 MW | Planned | 3.6 km |
| Data Vault - Bournemouth BCP01 | Data center | — | — | 4.3 km |
| Sky Chilworth | Data center | — | — | 41 km |
| SCC | Data center | — | — | 48 km |
Grid operator and place
More from Southern Electric Power Distribution plc
- Amersham GSPsubstation
- Loudwater BSPsubstation
- Bowerdean Primarysubstation
- Flackwell Heath Primarysubstation
- Well End Primarysubstation
- Wycombe Marsh Primarysubstation
- Axminster GSPsubstation
- Yeovil BSPsubstation
Other substations in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.