Substation · England, United Kingdom

Bitterne Primary

Bitterne Primary is a substation in England, United Kingdom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom3.4 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 10MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimarySSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromBotley Wood BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromNetley Common BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)None (green on the heat map)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels 33, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates50.9154, -1.3596SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 252 power plants (112 operating, 1,012 MW), 234 grid connections (130 operating, 1,162 MW), 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Allington Lane grid connectionGrid connection19 MWOperating2.4 km
Butts Field, Mill Lane - Battery StoragePower plant99 MWPermitted2.5 km
Weston Lane - Battery Storage FacilityPower plant49.9 MWCancelled2.6 km
Lower Russells FieldPower plant1 MWCancelled2.9 km
Netley PV grid connectionGrid connection9.5 MWOperating3.3 km
Waste 1.197 MW grid connection at WestonGrid connection1.2 MWOperating3.4 km
Sky ChilworthData center——7.0 km
Regit4uData center——7.7 km
SCCData center——9.5 km

Grid operator and place

More from Southern Electric Power Distribution plc

Other substations in England

All 1666 substations in England, United Kingdom

Data on this page