RARE CONTEXT Request research

Substation · England, United Kingdom

Banstead 11kV Substation

Banstead 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 5.6 MVA of demand headroom and 25.8 MVA of generation headroom, operated by South Eastern Power Networks plc (UK Power Networks, South East England licence area).

Map: where Banstead 11kV lies
51.3062, -0.2256 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom5.6 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom25.8 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity22.8 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.3062, -0.2256UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 323 grid connections (227 operating, 1,970 MW), 317 power plants (120 operating, 2,569 MW), 142 data centers (1 operating, 88 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Rushett Lane - Battery Storage SystemPower plant30 MWCancelled1.0 km
15 Cotswold Rd grid connectionGrid connection2 MWOperating4.9 km
Cheam WTW 213936 grid connectionGrid connection4.42 MWOperating6.4 km
Barnett Wood Lane - Battery StoragePower plant98 MWPermitted6.4 km
Rushett Lane grid connectionGrid connection30 MWPlanned6.6 km
Fair Oak LanePower plant49.9 MWCancelled7.5 km
Unit 1Data center——8.0 km
Unit 2Data center——8.0 km
Unit 3Data center——8.0 km

Grid operator and place

More from South Eastern Power Networks plc

Other substations in England

All 2633 substations in England, United Kingdom