Substation · England, United Kingdom

Balme Street

Balme Street is a substation in England, United Kingdom, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Demand headroom0 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Generation headroom3.1 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Firm capacity24 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
LevelPrimaryNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromBradford WestNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromBradfordNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (offtake)Limited (amber on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (feed-in)Limited (amber on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.7974, -1.7489Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this substation, or want an introduction to its grid operator? Ask us.

Nearby

Within 50 km of this substation: 463 grid connections (240 operating, 2,198 MW), 356 power plants (96 operating, 1,166 MW), 15 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Midland Road - Battery Energy StoragePower plant80 MWPermitted0.8 km
Battery storage 80 MW grid connection at Midland Road BESS DirectGrid connection80 MWPlanned1.0 km
University of Bradford grid connectionGrid connection1.4 MWOperating1.2 km
Gas 1.521 MW grid connection at Mount StreetGrid connection1.52 MWOperating1.5 km
Bradford Energy Recovery FacilityPower plant12.9 MWCancelled1.6 km
Stor Generation Plant - Battery StoragePower plant12 MWPermitted2.5 km
GridJetData center——12 km
Redcentric Elland Data CentreData center——12 km
Data center, England (OSM way 403124345)Data center——13 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other substations in England

All 1215 substations in England, United Kingdom

Data on this page