Substation · England, United Kingdom

Bagshot Primary

Bagshot Primary is a substation in England, United Kingdom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom7.48 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 12 / 24MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimarySSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromFleet-Bramley GSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromBracknell BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)None (green on the heat map)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels 33, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.3635, -0.6926SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 253 power plants (82 operating, 1,014 MW), 140 grid connections (74 operating, 769 MW) and 133 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Data Centre, Dennison House, Stanhope Road - Solar PanelsPower plant1.22 MWUnknown5.9 km
Data Centre, Dennison House, Stanhope Road - Solar PanelsPower plant1.15 MWPermitted5.9 km
Stanhope Road - Solar PanelsPower plant1.22 MWCancelled5.9 km
Gravity Edge LDN1Data center——6.2 km
Ark Data Centres - Longcross ParkData center——7.1 km
EXA Infrastructure - St James HouseData center——7.5 km
Generation 19 MW grid connection at Western Road GenerationGrid connection19 MWOperating7.8 km
Peakgen Bracknell grid connectionGrid connection19 MWOperating9.4 km
Solar 15.2 MW grid connection at Farnborough 2 GenerationGrid connection15.2 MWOperating12 km

Grid operator and place

More from Southern Electric Power Distribution plc

Other substations in England

All 1666 substations in England, United Kingdom

Data on this page