Substation · England, United Kingdom
Addington Grid 33kV Substation
Addington Grid 33kV Substation is a 33 kV primary substation in England, United Kingdom, with 13.9 MVA of demand headroom and 106 MVA of generation headroom, operated by South Eastern Power Networks plc (UK Power Networks, South East England licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | South Eastern Power Networks plc (UK Power Networks, South East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Demand headroom | 13.9 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Generation headroom | 106 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Firm capacity | 86.9 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Level | Primary substation | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.3444, -0.0379 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Nearby
Within 50 km of this substation: 355 grid connections (250 operating, 2,244 MW), 344 power plants (137 operating, 5,166 MW), 135 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Layhams Road - Battery Storage Facility | Power plant | 250 MW | Permitted | 3.2 km |
| Kenley WTW 21249 grid connection | Grid connection | 1.02 MW | Operating | 4.6 km |
| Biggin Hill Airport (Kite Shed) grid connection | Grid connection | 1.1 MW | Operating | 4.8 km |
| Biggin Hill Airport, Main Road - Solar PV Array | Power plant | 12 MW | Under construction | 5.0 km |
| Pulsant South London | Data center | — | — | 5.8 km |
| Selhurst Traincare Depot, Selhurst Road - Solar Panels | Power plant | 1 MW | Permitted | 6.1 km |
| Rolls Royce Power grid connection | Grid connection | 58 MW | Operating | 6.3 km |
| Segro Croydon (Morgan Stanley) | Data center | — | — | 8.1 km |
| CapitalLand - Croyden | Data center | — | — | 8.2 km |
Grid operator and place
More from South Eastern Power Networks plc
- Thanet Grid 33kVsubstation
- Hastings 33kVsubstation
- The Droveway 11kVsubstation
- Edenbridge 11kVsubstation
- Jarvis Brook 6.6kVsubstation
- Chatham Hill 11kVsubstation
- Selhurst 6.6kVsubstation
- Dymchurch 11kVsubstation
Other substations in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.