Church St Winsford T1 / Over T1 / Wharton PK T1 / Woodford PK T1 Substation
Church St Winsford T1 / Over T1 / Wharton PK T1 / Woodford PK T1 Substation is a 33 kV primary substation in the United Kingdom, with 12.5 MVA of demand headroom and 3.93 MVA of generation headroom, operated by SP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | CHURCH ST WINSFORD T1 / OVER T1 / WHARTON PK T1 / WOODFORD PK T1 | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Location | United Kingdom | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | SP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area) | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Demand headroom | 12.5 MVA | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Generation headroom | 3.93 MVA | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Firm capacity | 30 MVA | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Level | Primary substation | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV (levels 33, 11 kV) | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 53.1913, -2.5374 | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Nearby
Within 50 km of this substation: 417 grid connections (271 operating, 2,750 MW), 382 power plants (114 operating, 4,441 MW), 18 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Possible 2MW gen at Winsford Police HQ. grid connection | Grid connection | 2 MW | Operating | 1.0 km |
| Hebden Green Fm grid connection | Grid connection | 15 MW | Planned | 1.2 km |
| Woodford Lane West - Solar Farm (Hebden Green) | Power plant | 19 MW | Permitted | 2.0 km |
| Schoeller Allibert Limited, Road One - Solar Panels System | Power plant | 2.2 MW | Cancelled | 3.1 km |
| Stublach Project Solar Farm | Power plant | 2.25 MW | Cancelled | 6.8 km |
| Keuper Underground Gas Storage Facility Material Change 1 | Gas storage facility | — | Planned | 7.0 km |
| Keuper Gas Storage Project | Gas storage facility | — | Permitted | 7.4 km |
| Gas 21.18 MW grid connection at Elworth GT1 / Elworth GT2 / Knutsford GT1 / Knutsford GT2 | Grid connection | 21.2 MW | Operating | 7.6 km |
| Salinae Hydrogen Storage project | Gas storage facility | — | Planned | 7.6 km |
Grid operator and place
More from SP Manweb plc
- Aberdyfi T1substation
- Abergele T1 / Pensarn T1substation
- Abergele T1 / Pensarn T1substation
- Abersoch T1substation
- Aberystwyth T1 / North RD T1 / Parc-Y-Llyn T1 / Parc-Y-Llyn T2 / U C Wales T1substation
- Aberystwyth T1 / North RD T1 / Parc-Y-Llyn T1 / Parc-Y-Llyn T2 / U C Wales T1substation
- Aberystwyth T1 / North RD T1 / Parc-Y-Llyn T1 / Parc-Y-Llyn T2 / U C Wales T1substation
- Aberystwyth T1 / North RD T1 / Parc-Y-Llyn T1 / Parc-Y-Llyn T2 / U C Wales T1substation
Candidate sites around this substation
1 site of land near Church St Winsford T1 / Over T1 / Wharton PK T1 / Woodford PK T1 has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
Other substations in the United Kingdom
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.