Substation · North Rhine-Westphalia, Germany
Station Mündelheim
Station Mündelheim is a 220 kV substation in North Rhine-Westphalia, Germany, connected by RWE Aktiengesellschaft.
We hold more on this asset.Grid operator, location, planned reinforcement and voltage: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Rhine-Westphalia | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Grid operator | RWE Aktiengesellschaft | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Planned reinforcement | Available on request | Netzentwicklungsplan Strom: point measures (Punktmaßnahmen) · Restricted · checked 24 Oct 2026 |
| Voltage | 220 kV (levels 220, 110 kV) | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 51.3557, 6.7237 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its grid operator? Ask us.
Also recorded as
2 sources record Station Mündelheim; this page joins their facts, each with its own source. Links to any of the records lead here. How records are matched.
| Name in the source | Identifier | Source | Matched on |
|---|---|---|---|
| Station Mündelheim | asset:osm:way-91854336 | OpenStreetMap power infrastructure (Overpass) | — |
| Mündelheim substation | asset:nep:mundelheim | Netzentwicklungsplan Strom: point measures (Punktmaßnahmen) | Same name and Land |
Nearby
Within 50 km of this substation: 240 power plants (138 operating, 8,667 MW), 102 permit notices, 44 CO2 emitters (5 operating), 13 data centers and 2 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Glocke Duisburg | CO2 emitter | 3,901,188 tCO2e | — | 1.8 km |
| Huckingen | Power plant | 606 MW | Operating | 1.8 km |
| Kraftwerk Huckingen | CO2 emitter | 2,541,395 tCO2e | — | 1.8 km |
| HKW IIIA GT | CO2 emitter | 169,503 tCO2e | — | 3.8 km |
| HKW III/C Modul | Power plant | 42.3 MW | Planned | 4.3 km |
| Turbine 4 (Krefeld) | Power plant | 22.1 MW | Operating | 6.7 km |
| Wiit AG DUS | Data center | — | — | 12 km |
| Equinix DU1 | Data center | — | — | 16 km |
| ProHiPerSi | Processing plant | — | — | 20 km |
Grid operator and place
More from RWE Aktiengesellschaft
- Lingensubstation
- 110 kV substation (OSM way/104112267)substation
- Station Meschedesubstation
- Station Rheinesubstation
- Station Feldmarksubstation
- Station Münstersubstation
- Station Baumstraßesubstation
- Station Haansubstation
Candidate sites around this substation
1 site of land near Station Mündelheim has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 57 ha site at Gemarkung Mündelheim, Flur 11, Flurstück 6000.0 km · score 73
Other substations in North Rhine-Westphalia
Data on this page
- © European Union, European Commission (DG GROW). EU CRMA strategic projects, CC BY 4.0.
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.