Substation · Lower Saxony, Germany
Conneforde 380/220 kV
Conneforde 380/220 kV is a substation in Lower Saxony, Germany, connected by TenneT TSO GmbH.
We hold more on this asset.Planned reinforcement: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Lower Saxony | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Location | Lower Saxony | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | TenneT TSO GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Grid operator | TenneT TSO GmbH | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
| Planned reinforcement | Short-circuit strength upgrade (due 2028, transmission network, NEP measure M795, project TTG-P371, start grid (approved or under way)) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 380 kV (levels 380, 220 kV) | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 53.3324, 8.0506 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its grid operator? Ask us.
Also recorded as
2 sources record Conneforde 380/220 kV; this page joins their facts, each with its own source. Links to any of the records lead here. How records are matched.
| Name in the source | Identifier | Source | Matched on |
|---|---|---|---|
| Conneforde 380/220 kV | asset:osm:way-1128250707 | OpenStreetMap power infrastructure (Overpass) | — |
| Conneforde substation | asset:nep:conneforde | Netzentwicklungsplan Strom: point measures (Punktmaßnahmen) | Same name and Land |
Nearby
Within 50 km of this substation: 185 power plants (103 operating, 2,659 MW), 5 CO2 emitters (4,986,174 tCO2e) and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| WP Grabstederfeld | Power plant | 28.8 MW | Planned | 4.5 km |
| Windpark Rastede (Wapeldorf Süd) | Power plant | 12 MW | Planned | 6.8 km |
| Energiewende-Speicher | Power plant | 11.9 MW | Operating | 6.9 km |
| PKVarel Papierfabrik | CO2 emitter | 272,732 tCO2e | — | 9.4 km |
| Data center, Rastede (OSM way 348249606) | Data center | — | — | 18 km |
| Data center, Lower Saxony (OSM way 258743341) | Data center | — | — | 22 km |
| Data center, Lower Saxony (OSM way 1481438841) | Data center | — | — | 24 km |
| Steinkohlekraftwerk Wilhelmshaven | CO2 emitter | 1,504,581 tCO2e | — | 28 km |
| Dampfkesselanlage Großenkneten | CO2 emitter | 585,592 tCO2e | — | 43 km |
Grid operator and place
More from TenneT TSO GmbH
- Abzweig Waldeck substationsubstation
- Ahlten substationsubstation
- Alfstedtsubstation
- Audorf Südsubstation
- Bechterdissensubstation
- Umspannwerk Bergrheinfeld/Westsubstation
- Umspannwerk Bergshausen 380kVsubstation
- Bleckenstedt/Süd substationsubstation
Other substations in Lower Saxony
- 110 kV substation (OSM node/924018211)
- 110 kV substation (OSM way/1016436315)
- 110 kV substation (OSM way/1021637039)
- 110 kV substation (OSM way/1023904136)
- 110 kV substation (OSM way/1034844279)
- 110 kV substation (OSM way/1087945281)
- 110 kV substation (OSM way/1098352996)
- 110 kV substation (OSM way/1126924534)
Data on this page
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.