Substation · Bavaria, Germany
Umspannwerk Zolling
Umspannwerk Zolling is a 220 kV substation in Bavaria, Germany, connected by TenneT TSO GmbH.
We hold more on this asset.Grid operator, location, planned reinforcement and voltage: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Bavaria | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Grid operator | TenneT TSO GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Planned reinforcement | Available on request | Netzentwicklungsplan Strom: point measures (Punktmaßnahmen) · Restricted · checked 24 Oct 2026 |
| Voltage | 220 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 48.4558, 11.8075 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its grid operator? Ask us.
Also recorded as
2 sources record Umspannwerk Zolling; this page joins their facts, each with its own source. Links to any of the records lead here. How records are matched.
| Name in the source | Identifier | Source | Matched on |
|---|---|---|---|
| Umspannwerk Zolling | asset:osm:way-1568291190 | OpenStreetMap power infrastructure (Overpass) | — |
| Zolling substation | asset:nep:zolling | Netzentwicklungsplan Strom: point measures (Punktmaßnahmen) | Same name and Land |
Nearby
Within 50 km of this substation: 81 power plants (52 operating, 1,768 MW), 14 data centers, 10 CO2 emitters (4,916,040 tCO2e) and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| WEA-Nandlstadt | Power plant | 12 MW | Operating | 11 km |
| BHKW 2 - GOM 4 | Power plant | 19 MW | Operating | 11 km |
| Eitting | Power plant | 36 MW | Operating | 12 km |
| Rechenzentrum Garching | Data center | — | — | 24 km |
| Max-Planck-Gesellschaft Raven | AI supercomputer | 242 H100e | Operating | 24 km |
| LRZ SuperMUC-NG | Data center | — | — | 24 km |
| Data center, Bavaria (OSM way 39775468) | Data center | — | — | 30 km |
| Heizkraftwerk Nord 2 | CO2 emitter | 467,158 tCO2e | — | 33 km |
| Heizwerk Freimann | CO2 emitter | 175,367 tCO2e | — | 34 km |
Grid operator and place
More from TenneT TSO GmbH
- Abzweig Waldeck substationsubstation
- Ahlten substationsubstation
- Alfstedtsubstation
- Audorf Südsubstation
- Bechterdissensubstation
- Umspannwerk Bergrheinfeld/Westsubstation
- Umspannwerk Bergshausen 380kVsubstation
- Bleckenstedt/Süd substationsubstation
Other substations in Bavaria
- 110 kV substation (OSM relation/2574889)
- 110 kV substation (OSM way/100397098)
- 110 kV substation (OSM way/1004948093)
- 110 kV substation (OSM way/100871113)
- 110 kV substation (OSM way/102288092)
- 110 kV substation (OSM way/1055191365)
- 110 kV substation (OSM way/106991191)
- 110 kV substation (OSM way/107794030)
Data on this page
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.