53 ha site at Gemarkung Schnauderhainichen, Flurstück 308/7

A candidate site of 53.5 ha in Thuringia, made up of 1 cadastral parcel, mostly farmland. It lies 0.63 km from the 110 kV substation Umspannwerk Meuselwitz (Mitnetz Strom). The nearest transmission substation, Umspannwerk Pulgar (380 kV), is 14.5 km away, where the grid development plan lists 1 measure.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area53.5 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Schnauderhainichen, Flurstück 308/7)ALKIS Thüringen (open cadastre) · CC BY 4.0 · checked 24 Oct 2026
Land useFarmland (Landwirtschaft) (99% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationThuringiaRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates51.0652, 12.3199 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationUmspannwerk Meuselwitz (0.63 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorMitnetz StromOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannwerk Pulgar (14.5 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substation380 kV AC switchgear (replacement) (due 2045) (Netzentwicklungsplan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

How it compares

#94 of 200 sites in Thuringia and #2,401 of 4,863 in Germany by site score. Larger than 21% of the sites in Thuringia. Closer to its substation than 80% of them.

PartThis sitePointsOf
Area53.5 ha1735
Distance to the substation0.63 km2435
Substation voltage110 kV1030
Site score51100

How the site score works in Germany · Search sites in Thuringia

Nearby sites on the same substation

6 other sites have Umspannwerk Meuselwitz as nearest substation and would compete for its capacity.