Powered land · Saxony-Anhalt
50 ha site at Gemarkung Teutschenthal, Flur 5, Flurstück 2/16
A candidate site of 50 ha in Saxony-Anhalt, made up of 15 cadastral parcels, mostly farmland. It lies 0.37 km from the 110 kV substation Umspannwerk Angersdorf. The nearest transmission substation, Umspannwerk Lauchstädt (380 kV), is 4.8 km away, where the grid development plan lists 5 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 50 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 15 (largest: Gemarkung Teutschenthal, Flur 5, Flurstück 2/16) | ALKIS Sachsen-Anhalt (open cadastre) · dl-de/by-2-0 for LVermGeo open data · checked 24 Oct 2026 |
| Land use | Farmland (Landwirtschaft) (100% of the area, as the cadastre records it) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Location | Saxony-Anhalt | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.4262, 11.8252 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | Umspannwerk Angersdorf (0.37 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Lauchstädt (4.8 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | 380/220 kV grid coupling transformer (2x) (due 2026); STATCOM (2x) (due 2026-2030); MSCDN (2x) (due 2026-2030) (Netzentwicklungsplan; 2 more measures available on request) | Netzentwicklungsplan Strom: digital project library · record · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#84 of 256 sites in Saxony-Anhalt and #1,976 of 4,863 in Germany by site score. Larger than 17% of the sites in Saxony-Anhalt. Closer to its substation than 86% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 50 ha | 15.7 | 35 |
| Distance to the substation | 0.37 km | 28.5 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 54 | 100 |
How the site score works in Germany · Search sites in Saxony-Anhalt
Parcels in this site
Adjacent parcels that share at least 10 m of boundary, merged up to 50 ha, largest first. Each links to its cadastre record.
- Sites in Saxony-Anhalt265
- Sites in Germany5,000
- Umspannwerk Angersdorfsubstation
Data on this page
- © GeoBasis-DE/LVermGeo ST. ALKIS Sachsen-Anhalt (open cadastre), dl-de/by-2-0 for LVermGeo open data.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.