Powered land · Saxony-Anhalt

50 ha site at Gemarkung Peißen, Flur 4, Flurstück 453

A candidate site of 49.8 ha in Saxony-Anhalt, made up of 10 cadastral parcels, mostly industrial and commercial land. It lies 0.07 km from the 110 kV substation Umspannwerk Halle Reideburg (Netz Halle). The nearest transmission substation, Umspannwerk Lauchstädt (380 kV), is 15.8 km away, where the grid development plan lists 5 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area49.8 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels10 (largest: Gemarkung Peißen, Flur 4, Flurstück 453)ALKIS Sachsen-Anhalt (open cadastre) · dl-de/by-2-0 for LVermGeo open data · checked 24 Oct 2026
Land useIndustrial and commercial land (Industrie- und Gewerbefläche) (59% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationSaxony-AnhaltRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates51.4986, 12.0778 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationUmspannwerk Halle Reideburg (0.07 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorNetz HalleOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannwerk Lauchstädt (15.8 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substation380/220 kV grid coupling transformer (2x) (due 2026); STATCOM (2x) (due 2026-2030); MSCDN (2x) (due 2026-2030) (Netzentwicklungsplan; 2 more measures available on request)Netzentwicklungsplan Strom: digital project library · record · CC BY 4.0 · checked 24 Oct 2026

How it compares

#45 of 256 sites in Saxony-Anhalt and #1,319 of 4,863 in Germany by site score. Larger than 1% of the sites in Saxony-Anhalt. Closer to its substation than 94% of them.

PartThis sitePointsOf
Area49.8 ha15.735
Distance to the substation0.07 km33.835
Substation voltage110 kV1030
Site score59100

How the site score works in Germany · Search sites in Saxony-Anhalt

Parcels in this site

Adjacent parcels that share at least 10 m of boundary, merged up to 50 ha, largest first. Each links to its cadastre record.

Data on this page