Powered land · North Rhine-Westphalia

54 ha site at Gemarkung Euskirchen, Flur 46, Flurstück 3

A candidate site of 54.4 ha in North Rhine-Westphalia, made up of 1 cadastral parcel, mostly farmland. It lies 1.76 km from the 110 kV substation Umspannanlage Zülpich (Energiekontor Windstrom GmbH&Co). The nearest transmission substation, Station Sechtem (380 kV), is 17.5 km away, where the grid development plan lists 3 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area54.4 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Euskirchen, Flur 46, Flurstück 3)ALKIS Nordrhein-Westfalen (open cadastre) · dl-de/zero-2-0 · checked 24 Oct 2026
Land useFarmland (Landwirtschaft) (100% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationNorth Rhine-WestphaliaRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates50.6880, 6.7877 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationUmspannanlage Zülpich (1.76 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorEnergiekontor Windstrom GmbH&CoOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationStation Sechtem (17.5 km from the nearest parcel, 380 kV, Amprion GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substation380 kV shunt reactor (1x) (due 2032); Short-circuit strength upgrade (due 2037) (Netzentwicklungsplan; 1 more measure available on request)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

How it compares

#609 of 632 sites in North Rhine-Westphalia and #4,675 of 4,863 in Germany by site score. Larger than 34% of the sites in North Rhine-Westphalia. Closer to its substation than 12% of them.

PartThis sitePointsOf
Area54.4 ha17.335
Distance to the substation1.76 km4.235
Substation voltage110 kV1030
Site score31100

How the site score works in Germany · Search sites in North Rhine-Westphalia

Data on this page