Powered land · Mecklenburg-Vorpommern

88 ha site at Gemarkung Friedland, Flur 57, Flurstück 3/7

A candidate site of 87.7 ha in Mecklenburg-Vorpommern, made up of 1 cadastral parcel, mostly farmland. It lies 0.99 km from the 110 kV substation Friedland (E.DIS Netz GmbH). The nearest transmission substation, Umspannwerk Iven/West (380 kV), is 14.5 km away, where the grid development plan lists 8 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area87.7 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Friedland, Flur 57, Flurstück 3/7)ALKIS Mecklenburg-Vorpommern (open cadastre) · Free reuse with credit · checked 24 Oct 2026
Land useFarmland (Landwirtschaft) (96% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationMecklenburg-VorpommernRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates53.6811, 13.5195 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationFriedland (0.99 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorE.DIS Netz GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannwerk Iven/West (14.5 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substation380 kV shunt reactor (1x 176 Mvar) (due 2029); Power flow control (due 2032); STATCOM (1x) (due 2032) (Netzentwicklungsplan; 5 more measures available on request)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

How it compares

#68 of 247 sites in Mecklenburg-Vorpommern and #1,503 of 4,863 in Germany by site score. Larger than 75% of the sites in Mecklenburg-Vorpommern. Closer to its substation than 55% of them.

PartThis sitePointsOf
Area87.7 ha2935
Distance to the substation0.99 km17.735
Substation voltage110 kV1030
Site score57100

How the site score works in Germany · Search sites in Mecklenburg-Vorpommern

Data on this page