Powered land · Lower Saxony

62 ha site at Gemarkung Ramsloh, Flur 21, Flurstück 1

A candidate site of 61.6 ha in Lower Saxony, made up of 1 cadastral parcel. It lies 1.74 km from the 110 kV substation Langholt (Avacon Netz GmbH). The nearest transmission substation, Diele (380 kV), is 21 km away, where the grid development plan lists 4 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area61.6 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Ramsloh, Flur 21, Flurstück 1)ALKIS Niedersachsen (open cadastre) · CC BY 4.0 for LGLN OpenGeoData since 2024-06-09 · checked 24 Oct 2026
LocationLower SaxonyRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates53.0993, 7.6268 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationLangholt (1.74 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorAvacon Netz GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationDiele (21 km from the nearest parcel, 380 kV, TenneT TSO GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substationShort-circuit strength upgrade (due 2031); Phase-shifting transformer (2x) (due 2032); 380 kV shunt reactor (1x) (due 2033) (Netzentwicklungsplan; 1 more measure available on request)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

How it compares

#514 of 562 sites in Lower Saxony and #4,431 of 4,863 in Germany by site score. Larger than 49% of the sites in Lower Saxony. Closer to its substation than 13% of them.

PartThis sitePointsOf
Area61.6 ha19.835
Distance to the substation1.74 km4.635
Substation voltage110 kV1030
Site score34100

How the site score works in Germany · Search sites in Lower Saxony

Data on this page