Powered land · Brandenburg

62 ha site at Gemarkung Seeburg, Flur 4, Flurstück 22

A candidate site of 61.5 ha in Brandenburg, made up of 1 cadastral parcel. It lies 1.22 km from the 110 kV substation Umspannwerk Gatow (Vattenfall). The nearest transmission substation, Umspannwerk Reuter (380 kV), is 7.4 km away, where the grid development plan lists 5 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area61.5 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Seeburg, Flur 4, Flurstück 22)ALKIS Brandenburg (open cadastre) · dl-de/by-2-0 · checked 24 Oct 2026
LocationBrandenburgRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates52.5049, 13.1480 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationUmspannwerk Gatow (1.22 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorVattenfallOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannwerk Reuter (7.4 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substationReplacement/extension 380 kV shunt reactor (2x) (due 2030); 380 kV shunt reactor (1x 176 Mvar) (due 2035); Synchronous condenser (1x) (due 2035) (Netzentwicklungsplan; 2 more measures available on request)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

How it compares

#394 of 547 sites in Brandenburg and #3,478 of 4,863 in Germany by site score. Larger than 44% of the sites in Brandenburg. Closer to its substation than 43% of them.

PartThis sitePointsOf
Area61.5 ha19.835
Distance to the substation1.22 km13.735
Substation voltage110 kV1030
Site score43100

How the site score works in Germany · Search sites in Brandenburg

Nearby sites on the same substation

6 other sites have Umspannwerk Gatow as nearest substation and would compete for its capacity.

Data on this page