Powered land · Brandenburg

74 ha site at Gemarkung Bischdorf, Flur 12, Flurstück 102

A candidate site of 73.7 ha in Brandenburg, made up of 1 cadastral parcel. It lies 0.57 km from an unnamed 110 kV substation. The nearest transmission substation, Umspannwerk Ragow (380 kV), is 8.9 km away, where the grid development plan lists 4 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area73.7 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Bischdorf, Flur 12, Flurstück 102)ALKIS Brandenburg (open cadastre) · dl-de/by-2-0 · checked 24 Oct 2026
LocationBrandenburgRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates51.8124, 13.9846 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substation110 kV substation (OSM way/1218058707) (0.57 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannwerk Ragow (8.9 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Planned at that substation380 kV shunt reactor (2x) (due 2026-2030); STATCOM (2x) (due 2026-2030); 380 kV AC switchgear (replacement) (due 2045) (Netzentwicklungsplan; 1 more measure available on request)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Water stressHigh (40–80%) (score 3.8 of 5, withdrawals 71.1% of renewable supply)WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026

How it compares

#131 of 547 sites in Brandenburg and #1,266 of 4,863 in Germany by site score. Larger than 58% of the sites in Brandenburg. Closer to its substation than 75% of them.

PartThis sitePointsOf
Area73.7 ha2435
Distance to the substation0.57 km2535
Substation voltage110 kV1030
Site score59100

How the site score works in Germany · Search sites in Brandenburg

Nearby sites on the same substation

11 other sites have this substation as nearest substation and would compete for its capacity.

Data on this page