Power plant · Carmarthenshire, Wales, United Kingdom

Tycroes Solar Farm

Tycroes Solar Farm is a permitted power plant in Carmarthenshire, Wales, United Kingdom, with 40 MW of capacity, operated by Spring Dev 2.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCarmarthenshire (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand to the east of the A48 and Land to the south west of Tycroes, Carmarthenshire, SA18 3REDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date12 Aug 2021 (permit DNS/3227364, Welsh Government development of national significance, issued by Welsh Government (NSIP))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date3 Jun 2020 (reference DNS/3227364, planning authority Welsh Government (NSIP))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date12 Aug 2021 (granted, reference DNS/3227364, planning authority Welsh Government (NSIP))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSpring Dev 2DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity40 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7743, -4.0478DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Welsh Government (NSIP), reference DNS/3227364)
  2. Permit applied for (planning authority Welsh Government (NSIP), reference DNS/3227364)

How it compares

Tycroes Solar Farm is the 63rd-largest of 177 power plants planned, permitted or under construction in Wales and the 1,342nd-largest of 3,222 in the United Kingdom by capacity; its 40 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Wales63rd of 17716,801 MW0.24%
United Kingdom1,342nd of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,556th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 1 transmission line and 1 data center, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Brechfa Forest ConnectionTransmission line—Permitted23 km
CGI DatacenterData center——45 km