Power plant · Neath Port Talbot, Wales, United Kingdom

PwllfaWatkin Landfill Gas Site

PwllfaWatkin Landfill Gas Site is a power plant in Neath Port Talbot, Wales, United Kingdom, with 3.2 MW of capacity, operated by Waste Recycling Group.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNeath Port Talbot (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressPwllfawatkin Landfill Site Rhy Dy Fro Pontardawe Swansea West Glamorgan SA8 4RXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2005DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date11 Aug 2005 (permit P/05/213, Town and Country Planning Act, issued by Neath Port Talbot)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date26 Jan 2005 (reference P/05/213, planning authority Neath Port Talbot)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date11 Aug 2005 (granted, reference P/05/213, planning authority Neath Port Talbot)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWaste Recycling GroupDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyLandfill GasDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7360, -3.8578DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Neath Port Talbot, reference P/05/213)
  3. Permit applied for (planning authority Neath Port Talbot, reference P/05/213)

How it compares

PwllfaWatkin Landfill Gas Site is the 325th-largest of 424 power plants in Wales and the 3,718th-largest of 5,050 in the United Kingdom by capacity; its 3.2 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales325th of 4249,068 MW<0.1%
United Kingdom3,718th of 5,050115,622 MW<0.1%
All power plants in our data9,626th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 2 data centers and 1 transmission line, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
CGI DatacenterData center——33 km
Brechfa Forest ConnectionTransmission line—Permitted34 km
Centerprise International (Distribution)Data center——45 km

Operator and place

More from Waste Recycling Group

Other power plants in Wales

All 616 power plants in Wales, United Kingdom

Data on this page