New Lodge Farm - ACT

New Lodge Farm - ACT is a cancelled power plant in Carmarthenshire, Wales, United Kingdom, with 12 MW of capacity, operated by Clean Power Properties.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCarmarthenshire (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSA14 6PWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date5 Feb 2014 (reference S/29559, planning authority Carmarthenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Feb 2016 (refused, reference S/29559, planning authority Carmarthenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorClean Power PropertiesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity12 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAdvanced Conversion TechnologiesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7693, -4.0687DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Carmarthenshire, reference S/29559)
  2. Permit applied for (planning authority Carmarthenshire, reference S/29559)

How it compares

New Lodge Farm - ACT is the 120th-largest of 424 power plants in Wales and the 1,630th-largest of 5,050 in the United Kingdom by capacity; its 12 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales120th of 4249,068 MW0.13%
United Kingdom1,630th of 5,050115,622 MW<0.1%
All power plants in our data6,178th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 1 transmission line and 1 data center, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Brechfa Forest ConnectionTransmission line—Permitted23 km
CGI DatacenterData center——46 km

Operator and place

More from Clean Power Properties

Other power plants in Wales

All 616 power plants in Wales, United Kingdom