Power plant · Swansea, Wales, United Kingdom

Kings Dock Biomass Power Station

Kings Dock Biomass Power Station is a cancelled biomass power plant in Swansea, Wales, United Kingdom, with 49.9 MW of capacity, operated by Dingle Holdings.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSwansea (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressKings Dock , Swansea, SA1 8QTDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date27 Nov 2007 (reference 2007/2684, planning authority Swansea)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Apr 2009 (refused, reference 2007/2684, planning authority Swansea)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Dec 2010 (appeal refused, reference 2007/2684, planning authority Swansea)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorDingle Holdings (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBiomass (dedicated)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6163, -3.9070DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Swansea, reference 2007/2684)
  2. Permit refused (planning authority Swansea, reference 2007/2684)
  3. Permit applied for (planning authority Swansea, reference 2007/2684)

How it compares

Kings Dock Biomass is the 40th-largest of 451 power plants in Wales and the 538th-largest of 5,834 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales40th of 45116,665 MW0.3%
United Kingdom538th of 5,834200,500 MW<0.1%
All power plants in our data3,762nd of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 2 data centers and 1 transmission line, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
CGI DatacenterData center——26 km
Brechfa Forest ConnectionTransmission line—Permitted43 km
Centerprise International (Distribution)Data center——47 km

Operator and place

Other power plants in Wales

All 622 power plants in Wales, United Kingdom

Data on this page