Power plant · Carmarthenshire, Wales, United Kingdom

Dura Park Bynea Industrial Site

Dura Park Bynea Industrial Site is a power plant in Carmarthenshire, Wales, United Kingdom, with 1.4 MW of capacity, operated by Short Bros Homes.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCarmarthenshire (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressFormer Bowdens Site, Yspitty Road, Dura Industrial Park, Llanelli, Dyfed, Wales, SA14 9TDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date15 Dec 2015 (permit S/32873, Town and Country Planning Act, issued by Carmarthenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Oct 2015 (reference S/32873, planning authority Carmarthenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Dec 2015 (granted, reference S/32873, planning authority Carmarthenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorShort Bros HomesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.4 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6681, -4.0874DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Dura Park Bynea Industrial Site is the 400th-largest of 424 power plants in Wales and the 4,668th-largest of 5,050 in the United Kingdom by capacity; its 1.4 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales400th of 4249,068 MW<0.1%
United Kingdom4,668th of 5,050115,642 MW<0.1%
All power plants in our data11,264th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating
  2. Permit issued (Town and Country Planning Act), no. S/32873

Nearby

Within 50 km of this power plant: 124 grid connections, 1 transmission line and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Pencoed LLWCHWR grid connectionGrid connection——1.8 km
Dafen Reserve Power LLETHRI RD Dafen grid connectionGrid connection——4.7 km
Gas 20 MW grid connection at Swansea North BspGrid connection——5.2 km
Brechfa Forest ConnectionTransmission line—Permitted33 km
CGI DatacenterData center——40 km

Operator and place

Other power plants in Wales

All 616 power plants in Wales, United Kingdom

Data on this page