Power plant · Swansea, Wales, United Kingdom

Coed Bach Park, Gwynfryn Road - Solar Panels

Coed Bach Park, Gwynfryn Road - Solar Panels is a planned power plant in Swansea, Wales, United Kingdom, with 15 MW of capacity, operated by Stellar Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSwansea (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCoed Bach Park, Gwynfryn Road, Pontarddulais, Swansea, SA4 8LGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 Aug 2025 (reference 2025/1812/FUL, planning authority Swansea)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorStellar EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity15 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area0.01 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7112, -4.0328DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Swansea, reference 2025/1812/FUL)

How it compares

Coed Bach Park, Gwynfryn Road - Solar Panels is the 109th-largest of 177 power plants planned, permitted or under construction in Wales and the 2,094th-largest of 3,222 in the United Kingdom by capacity; its 15 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Wales109th of 17716,801 MW<0.1%
United Kingdom2,094th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data4,421st of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 1 transmission line and 1 data center, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Brechfa Forest ConnectionTransmission line—Permitted30 km
CGI DatacenterData center——40 km

Operator and place

Other power plants in Wales

All 616 power plants in Wales, United Kingdom