Woodlands Farm - Elion is a cancelled wind power plant in Aberdeenshire, Scotland, United Kingdom, with 2.3 MW of capacity, operated by Scotfarms Ltd.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Aberdeenshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Udny, Ellon, Grampian, AB41 6SP | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (appeal refused) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 4 Dec 2008 (reference APP/2008/4051, planning authority Aberdeenshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 29 Jun 2015 (refused, reference APP/2008/4051, planning authority Aberdeenshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 25 Jun 2010 (appeal refused, reference APP/2008/4051, planning authority Aberdeenshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Scotfarms Ltd (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 2.3 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 1 units (2.3 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 57.3059, -2.2003 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit refused (planning authority Aberdeenshire, reference APP/2008/4051)
- Permit refused (appeal refused, planning authority Aberdeenshire, reference APP/2008/4051)
- Permit applied for (planning authority Aberdeenshire, reference APP/2008/4051)
How it compares
Woodlands Farm - Elion is the 1,084th-largest of 1,340 power plants in Scotland and the 4,694th-largest of 5,834 in the United Kingdom by capacity; its 2.3 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 1,084th of 1,340 | 46,467 MW | <0.1% |
| United Kingdom | 4,694th of 5,834 | 200,500 MW | <0.1% |
| All power plants in our data | 13,826th of 15,799 | 1,918,113 MW | <0.1% |
Nearby
Within 50 km of this power plant: 145 grid connections (63 operating, 475 MW), 78 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Udny Community grid connection | Grid connection | 1.07 MW | Operating | 1.7 km |
| Kingseat Primary | Substation | — | — | 4.5 km |
| Cairnbrogie Wind Farm grid connection | Grid connection | 4.1 MW | Planned | 5.0 km |
| Cairnbrogie Wind Farm grid connection | Grid connection | 4.5 MW | Planned | 5.0 km |
| Oldmeldrum Primary | Substation | — | — | 7.2 km |
| Balmedie Primary | Substation | — | — | 9.2 km |
| Brightsolid | Data center | — | — | 17 km |
Operator and place
Other power plants in Scotland
- Longannet2,260 MW
- Torness1,200 MW
- Peterhead1,180 MW
- Seagreen1,075 MW
- Hunterston B985 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Auchentiber Road - Battery Energy Storage System700 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DUKES 5.11: Power stations in the United Kingdom, Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- Wikidata. Wikidata, CC0 1.0.