Power plant · East Ayrshire, Scotland, United Kingdom
Whitelee Windfarm Extension Phase 3
Whitelee Windfarm Extension Phase 3 is a cancelled power plant in East Ayrshire, Scotland, United Kingdom, with 12 MW of capacity, operated by Scottish Power Renewables.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | East Ayrshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Eaglesham Moor, to the south of Glasgow | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (appeal refused) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 13 Aug 2012 (planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 19 Oct 2016 (refused, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 19 Oct 2016 (appeal refused, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Scottish Power Renewables | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 12 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 5 units (2.3 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.6785, -4.2842 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit refused (appeal refused, planning authority Scottish Government (S36))
- Permit refused (planning authority Scottish Government (S36))
- Permit applied for (planning authority Scottish Government (S36))
How it compares
Whitelee Windfarm Extension Phase 3 is the 581st-largest of 1,196 power plants in Scotland and the 1,630th-largest of 5,050 in the United Kingdom by capacity; its 12 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 581st of 1,196 | 34,589 MW | <0.1% |
| United Kingdom | 1,630th of 5,050 | 115,622 MW | <0.1% |
| All power plants in our data | 6,178th of 12,032 | 1,190,447 MW | <0.1% |
Nearby
Within 50 km of this power plant: 8 substations, 6 grid connections (3 operating, 25.4 MW) and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Asanti Hamilton | Data center | — | — | 16 km |
| iomart Glasgow Data Centre | Data center | — | — | 19 km |
| Verizon Glasgow GLSGGB | Data center | — | — | 20 km |
| Strathleven GSP | Substation | — | — | 36 km |
| Auchencarroch Energy Ltd grid connection | Grid connection | 3.04 MW | Operating | 39 km |
| Auchincarroch (GEN464G2) grid connection | Grid connection | 1.01 MW | Operating | 39 km |
| Ballochmartin Farm grid connection | Grid connection | 3.5 MW | Planned | 40 km |
| Killearn Primary | Substation | — | — | 42 km |
| Blairlinnans Primary | Substation | — | — | 43 km |
Operator and place
More from Scottish Power Renewables
- Ossian3,600 MW · permitted
- Machair2,000 MW · planned
- East Anglia 3 (EA 3)1,400 MW · under construction
- East Anglia 2 (EA 2)900 MW · permitted
- East Anglia 1 North (EA 4)800 MW · permitted
- East Anglia 1 (EA 1)714 MW
- Kilgallioch wind farm239 MW
- Harestanes136 MW
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.