Power plant · Scottish Borders, Scotland, United Kingdom

Water Treatment Works, Howden Wells - Solar Photovoltaic System

Water Treatment Works, Howden Wells - Solar Photovoltaic System is a permitted power plant in Scottish Borders, Scotland, United Kingdom, with 1.14 MW of capacity, operated by Scottish Water.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScottish Borders (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWater Treatment Works, Howden Wells, Howden Farm, Selkirk, TD7 5HQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date29 Sept 2023 (permit 23/01119/CLPU, Town and Country Planning Act, issued by Scottish Borders)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date9 Aug 2023 (reference 23/01119/CLPU, planning authority Scottish Borders)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Sept 2023 (granted, reference 23/01119/CLPU, planning authority Scottish Borders)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorScottish WaterDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.14 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.5408, -2.8602DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Scottish Borders, reference 23/01119/CLPU)
  2. Permit applied for (planning authority Scottish Borders, reference 23/01119/CLPU)

How it compares

Water Treatment Works, Howden Wells - Solar Photovoltaic System is the 846th-largest of 872 power plants planned, permitted or under construction in Scotland and the 3,055th-largest of 3,222 in the United Kingdom by capacity; its 1.14 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland846th of 87299,272 MW<0.1%
United Kingdom3,055th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data6,287th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 3 data centers, 2 grid connections (11.6 MW), 1 transmission line and 1 substation, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
RBS Melville Gate Data CentreData center——42 km
Cross Border Connection (England)Transmission line—Planned44 km
RBS Data CentreData center——45 km
Kielder Hydro grid connectionGrid connection5.6 MWOperating46 km
Hydro 6 MW grid connection at Kielder HydroGrid connection6 MWOperating48 km
KielderSubstation——48 km
Data center, Scotland (OSM way 1548060501)Data center——49 km

Operator and place

More from Scottish Water

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page