Power plant · Fife, Scotland, United Kingdom
Troywood Wind Turbine
Troywood Wind Turbine is a cancelled wind power plant in Fife, Scotland, United Kingdom, with 2.3 MW of capacity.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Fife (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning application withdrawn) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 8 Oct 2013 (withdrawn, reference 09/02880/FULL, planning authority Fife) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 2.3 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 1 units (2.3 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 56.2751, -2.7097 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its owner.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the owner.
Latest events
Dated events about this power plant from official notices, registers and owners' press releases, newest first. All recent changes.
- Withdrawn (planning authority Fife, reference 09/02880/FULL)
How it compares
Troywood Wind Turbine was cancelled before it was built: it is not ranked among the power plants that run, and its 2.3 MW is not counted in their totals.
Nearby
Within 50 km of this power plant: 153 grid connections (69 operating, 1,138 MW), 125 substations and 2 data centers, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Bonerbo Wind Cluster grid connection | Grid connection | 2 MW | Operating | 2.6 km |
| Anstruther | Substation | — | — | 5.7 km |
| St. Andrews | Substation | — | — | 8.5 km |
| Colinsburgh | Substation | — | — | 12 km |
| Pusk Farm Solar and BESS grid connection | Grid connection | 109 MW | Planned | 18 km |
| Fife Energy Park Wind Turbine Test Facility grid connection | Grid connection | 7 MW | Operating | 20 km |
| RBS Data Centre | Data center | — | — | 39 km |
| RBS Melville Gate Data Centre | Data center | — | — | 48 km |
Place
Other power plants in Scotland
- Longannet2,260 MW
- Torness1,200 MW
- Peterhead1,180 MW
- Seagreen1,075 MW
- Hunterston B985 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Auchentiber Road - Battery Energy Storage System700 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.