Power plant · Highland, Scotland, United Kingdom

Tomatin Wind Farm

Tomatin Wind Farm is a cancelled wind power plant in Highland, Scotland, United Kingdom, with 25.5 MW of capacity, operated by Nanclach Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHighland (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressInverness, Highlands, IV33DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Jun 2009 (reference 09/00439/FUL, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Aug 2013 (refused, reference 09/00439/FUL, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNanclach Ltd (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity25.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units17 units (1.5 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates57.3444, -4.0189DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Highland, reference 09/00439/FUL)
  2. Permit applied for (planning authority Highland, reference 09/00439/FUL)

How it compares

Tomatin is the 421st-largest of 1,340 power plants in Scotland and the 1,245th-largest of 5,834 in the United Kingdom by capacity; its 25.5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland421st of 1,34046,467 MW<0.1%
United Kingdom1,245th of 5,834200,500 MW<0.1%
All power plants in our data5,798th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 57 substations and 44 grid connections (23 operating, 545 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Tomatin PrimarySubstation——0.6 km
Inverarnie PrimarySubstation——11 km
Fairways Inverness Ltd grid connectionGrid connection50 MWPlanned17 km
Culloden PrimarySubstation——17 km
9.9MW Export grid connectionGrid connection29.8 MWPlanned18 km
TOM NAN Clach Farm Wind grid connectionGrid connection37.1 MWOperating18 km

Operator and place

More from Nanclach Ltd

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page