Power plant · Highland, Scotland, United Kingdom
Tom Na Clach - Wind Farm Extension
Tom Na Clach - Wind Farm Extension is a permitted power plant in Highland, Scotland, United Kingdom, with 31.5 MW of capacity, operated by Infinergy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Highland (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Tom Nan Clach Wind Farm, Glenferness, IV12 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 10 May 2024 (permit ECU00003453, Electricity Act 1989 section 36, issued by Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 6 Apr 2022 (reference ECU00003453, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 10 May 2024 (granted, reference ECU00003453, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Infinergy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 31.5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 7 units (4.5 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 57.3863, -3.8851 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Scottish Government (S36), reference ECU00003453)
- Permit applied for (planning authority Scottish Government (S36), reference ECU00003453)
How it compares
Tom Na Clach - Wind Farm Extension is the 498th-largest of 872 power plants planned, permitted or under construction in Scotland and the 1,558th-largest of 3,222 in the United Kingdom by capacity; its 31.5 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 498th of 872 | 99,272 MW | <0.1% |
| United Kingdom | 1,558th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,947th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 61 substations and 47 grid connections (20 operating, 473 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Tomatin Primary | Substation | — | — | 9.0 km |
| TOM NAN Clach Farm Wind grid connection | Grid connection | 37.1 MW | Operating | 9.4 km |
| Cairn Duhie Wind Farm grid connection | Grid connection | 104 MW | Planned | 16 km |
| NAN Clach Extension grid connection | Grid connection | 70 MW | Planned | 16 km |
| Lethen Primary | Substation | — | — | 17 km |
| Boat of Garten Primary | Substation | — | — | 17 km |
Operator and place
More from Infinergy
- Dorenell Wind Farm (Previously Site A and B Scaut Hill)177 MW
- Hill of Fare Wind Farm150 MW
- Clashindarroch Wind Farm Extension139 MW · permitted
- Shepherd's Rig Wind Farm81 MW · permitted
- Limekiln Wind Farm79.8 MW
- Limekiln, Borlum House - Battery Energy Storage System70 MW · planned
- Clashindarroch Wind Farm Extension50 MW · permitted
- Loch Toftingall, Halsary Wind Farm - Battery Energy Storage49.9 MW · permitted
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.