Power plant · Highland, Scotland, United Kingdom
The Smithy - Battery Storage
The Smithy - Battery Storage is a permitted battery storage plant in Highland, Scotland, United Kingdom, with 45 MW of capacity, operated by Renewable Energy Systems.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Highland (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land 410M NE Of The Smithy Alness, IV17 0XH | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 29 Jan 2025 (permit 23/05999/FUL, Town and Country Planning Act, issued by Highland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 4 Jan 2024 (reference 23/05999/FUL, planning authority Highland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 29 Jan 2025 (granted, reference 23/05999/FUL, planning authority Highland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Renewable Energy Systems (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 45 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 57.7096, -4.2771 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Highland, reference 23/05999/FUL)
- Permit applied for (planning authority Highland, reference 23/05999/FUL)
How it compares
The Smithy - Battery Storage is the 381st-largest of 742 power plants planned, permitted or under construction in Scotland and the 1,092nd-largest of 2,548 in the United Kingdom by capacity; its 45 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 381st of 742 | 93,216 MW | <0.1% |
| United Kingdom | 1,092nd of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,242nd of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 58 substations and 55 grid connections (25 operating, 437 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Alness GSP | Substation | — | — | 0.2 km |
| Balnacraig Battery Storage grid connection | Grid connection | 50 MW | Planned | 0.6 km |
| Contullich Primary | Substation | — | — | 0.8 km |
| Crosshills Primary | Substation | — | — | 1.4 km |
| Contullich BESS grid connection | Grid connection | 52.7 MW | Planned | 2.2 km |
| Wester Teaninich grid connection | Grid connection | 35.1 MW | Planned | 4.1 km |
Operator and place
More from Renewable Energy Systems
- Clune Wind Farm - Wind Farm187 MW · planned
- Bloch Wind Farm & Battery Storage (Solway Bank Extension)126 MW · planned
- Longcroft Wind Farm125 MW · planned
- Clune Wind Farm - Battery Energy Storage100 MW · planned
- South Thinford Lane, Thinford - Energy Storage99.9 MW
- Llanbrynmair Wind Farm69 MW
- Cairn Duhie Wind Farm67.2 MW · permitted
- Keirs Hill (Sclenteuch) Wind Farm57.8 MW
Other power plants in Scotland
- Longannet2,260 MW
- Torness1,200 MW
- Peterhead1,180 MW
- Seagreen1,075 MW
- Hunterston B985 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Auchentiber Road - Battery Energy Storage System700 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- Wikidata. Wikidata, CC0 1.0.