Power plant · Aberdeenshire, Scotland, United Kingdom

Stony Hill Wind Farm

Stony Hill Wind Farm is a cancelled wind power plant in Aberdeenshire, Scotland, United Kingdom, with 18 MW of capacity, operated by Stony Hill Wind Farm Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAberdeenshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand at Stony Hill/RedHill, Lenchie, Insch, AB52 6NEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date4 Jul 2013 (reference APP/2013/2064, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 May 2015 (withdrawn, reference APP/2013/2064, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorStony Hill Wind Farm Ltd (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity18 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units5 units (3.6 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates57.3796, -2.6872DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Aberdeenshire, reference APP/2013/2064)
  2. Permit applied for (planning authority Aberdeenshire, reference APP/2013/2064)

How it compares

Stony Hill is the 561st-largest of 1,340 power plants in Scotland and the 1,668th-largest of 5,834 in the United Kingdom by capacity; its 18 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland561st of 1,34046,467 MW<0.1%
United Kingdom1,668th of 5,834200,500 MW<0.1%
All power plants in our data7,242nd of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 132 grid connections (60 operating, 534 MW), 88 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Gartly Moor grid connectionGrid connection20 MWPlanned3.5 km
Dummuie Windfarm grid connectionGrid connection11.6 MWOperating5.3 km
Insch PrimarySubstation——5.7 km
Kirkton Farm Wind Turbine Project grid connectionGrid connection6.56 MWOperating6.2 km
Huntly PrimarySubstation——9.1 km
Rothienorman GSPSubstation——11 km
BrightsolidData center——41 km

Operator and place

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page