Power plant · West Dunbartonshire, Scotland, United Kingdom

Rothesay Dock Plastic to Hydrogen Recycling Facility

Rothesay Dock Plastic to Hydrogen Recycling Facility is a cancelled power plant in West Dunbartonshire, Scotland, United Kingdom, with 3.8 MW of capacity, operated by The Peel Group.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWest Dunbartonshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressRothesay Dock, Cart Street, Clydebank, G81 1QBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Aug 2021 (reference DC21/217/FUL, planning authority West Dunbartonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Dec 2022 (withdrawn, reference DC21/217/FUL, planning authority West Dunbartonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorThe Peel GroupDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyHydrogenDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.8963, -4.3980DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority West Dunbartonshire, reference DC21/217/FUL)
  2. Permit applied for (planning authority West Dunbartonshire, reference DC21/217/FUL)

How it compares

Rothesay Dock Plastic to Hydrogen Recycling Facility is the 874th-largest of 1,196 power plants in Scotland and the 3,623rd-largest of 5,050 in the United Kingdom by capacity; its 3.8 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland874th of 1,19634,589 MW<0.1%
United Kingdom3,623rd of 5,050115,622 MW<0.1%
All power plants in our data9,447th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 22 substations, 14 grid connections (9 operating, 223 MW) and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
iomart Glasgow Data CentreData center——8.7 km
Verizon Glasgow GLSGGBData center——9.1 km
DataVita DV2Data center——9.2 km
Strathleven GSPSubstation——12 km
Auchencarroch Energy Ltd grid connectionGrid connection3.04 MWOperating15 km
Auchincarroch (GEN464G2) grid connectionGrid connection1.01 MWOperating15 km
Killearn PrimarySubstation——17 km
Blairlinnans PrimarySubstation——18 km
Ross Priory Hydro grid connectionGrid connection4 MWPlanned20 km

Operator and place

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page