Power plant · Fife, Scotland, United Kingdom

Roaring Hill, Whinnyknowe - Battery Energy Storage System

Roaring Hill, Whinnyknowe - Battery Energy Storage System is a planned battery storage plant in Fife, Scotland, United Kingdom, with 60 MW of capacity, operated by ELM Power Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationFife (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressRoaring Hill, Whinnyknowe, Leslie, Glenrothes, KY6 3HADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Jul 2025 (reference ECU00005104, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorELM Power Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity60 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.2076, -3.2042DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Scottish Government (S36), reference ECU00005104)

How it compares

Roaring Hill, Whinnyknowe - Battery Energy Storage System is the 238th-largest of 742 power plants planned, permitted or under construction in Scotland and the 618th-largest of 2,548 in the United Kingdom by capacity; its 60 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland238th of 74293,216 MW<0.1%
United Kingdom618th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data1,624th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 69 grid connections (21 operating, 370 MW), 52 substations and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Binn Farm Glenfarg grid connectionGrid connection30 MWPlanned9.9 km
Binn Farm Wind Farm grid connectionGrid connection6.7 MWOperating14 km
Binn Farm - Wind grid connectionGrid connection9.9 MWPlanned14 km
Milnathort PrimarySubstation——14 km
Abernethy GSPSubstation——16 km
Abernethy PrimarySubstation——16 km
Pulsant Edinburgh SC-1Data center——31 km
Pulsant Edinburgh South Gyle SC-1Data center——31 km
Data center, Scotland (OSM way 1548060501)Data center——32 km

Operator and place

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page