Power plant · East Lothian, Scotland, United Kingdom

Pure Malt Products AD Power Station

Pure Malt Products AD Power Station is a biomass power plant in East Lothian, Scotland, United Kingdom, with 1.5 MW of capacity, operated by Pure Malt Products Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Lothian (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressPure Malt Products Ltd Whittingehame Drive Haddington, EH41 4BDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2016DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date20 Dec 2013 (permit 13/00845/P, Town and Country Planning Act, issued by East Lothian)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date30 Oct 2013 (reference 13/00845/P, planning authority East Lothian)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date20 Dec 2013 (granted, reference 13/00845/P, planning authority East Lothian)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPure Malt Products LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.9580, -2.7677DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority East Lothian, reference 13/00845/P)
  3. Permit applied for (planning authority East Lothian, reference 13/00845/P)

How it compares

Pure Malt Products AD is the 525th-largest of 582 power plants in Scotland and the 2,605th-largest of 2,942 in the United Kingdom by capacity; its 1.5 MW is <0.1% of the 105,383 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland525th of 58220,278 MW<0.1%
United Kingdom2,605th of 2,942105,383 MW<0.1%
All power plants in our data11,509th of 12,2301,691,896 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 9 data centers and 1 grid connection, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
RBS Data CentreData center——8.4 km
RBS Melville Gate Data CentreData center——21 km
Data center, Scotland (OSM way 1548060501)Data center——30 km
Binn Farm Glenfarg grid connectionGrid connection30 MWPlanned48 km

Operator and place

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page