Power plant · Inverclyde, Scotland, United Kingdom

Priestside Farm

Priestside Farm is a cancelled wind power plant in Inverclyde, Scotland, United Kingdom, with 1.8 MW of capacity.

Map: where Priestside Farm lies
55.9156, -4.6751 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationInverclyde (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date4 Feb 2013 (reference 13/0036/IC, planning authority Inverclyde)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date23 Apr 2013 (refused, reference 13/0036/IC, planning authority Inverclyde)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units2 units (0.9 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.9156, -4.6751DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its owner.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the owner.

Latest events

Dated events about this power plant from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit refused (planning authority Inverclyde, reference 13/0036/IC)
  2. Permit applied for (planning authority Inverclyde, reference 13/0036/IC)

How it compares

Priestside Farm was cancelled before it was built: it is not ranked among the power plants that run, and its 1.8 MW is not counted in their totals.

Nearby

Within 50 km of this power plant: 208 substations, 199 grid connections (102 operating, 1,187 MW) and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Priestside Farm Wind Turbine grid connectionGrid connection1.8 MWOperating0.2 km
Port GlasgowSubstation——1.2 km
Ardgowan Estate grid connectionGrid connection23.8 MWPlanned1.8 km
Harelaw Gas grid connectionGrid connection20 MWOperating2.1 km
Boundary StreetSubstation——3.2 km
KilmacolmSubstation——3.9 km
iomart Glasgow Data CentreData center——25 km
Verizon Glasgow GLSGGBData center——26 km
DataVita DV2Data center——26 km