Power plant · Highland, Scotland, United Kingdom

Philips Mains, Mey - Battery Energy Storage

Philips Mains, Mey - Battery Energy Storage is a permitted power plant in Highland, Scotland, United Kingdom, with 300 MW of capacity, operated by Ampeak Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHighland (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address500m W/O Philips Mains, Mey, Thurso, KW14 8XHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 Jan 2026 (permit ECU00004838, Electricity Act 1989 section 36, issued by Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Jun 2024 (reference ECU00004838, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Jan 2026 (granted, reference ECU00004838, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAmpeak Energy (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity300 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates58.6383, -3.2281DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Scottish Government (S36), reference ECU00004838)
  2. Permit applied for (planning authority Scottish Government (S36), reference ECU00004838)

How it compares

Philips Mains, Mey - Battery Energy Storage is the 61st-largest of 742 power plants planned, permitted or under construction in Scotland and the 213th-largest of 2,549 in the United Kingdom by capacity; its 300 MW is 0.11% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland61st of 74293,216 MW0.32%
United Kingdom213th of 2,549279,978 MW0.11%
All power plants planned, permitted or under construction in our data476th of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 54 grid connections (26 operating, 303 MW) and 21 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Lochend Wind grid connectionGrid connection12.2 MWPlanned5.2 km
Lochend Wind grid connectionGrid connection8 MWPlanned5.2 km
Lochend Wind grid connectionGrid connection8.74 MWOperating5.2 km
Hastigrow PrimarySubstation——12 km
Mount Pleasant PrimarySubstation——17 km
Thurso South GSPSubstation——18 km

Operator and place

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom