Power plant · Highland, Scotland, United Kingdom
Ourack
Ourack is a permitted power plant in Highland, Scotland, United Kingdom, with 50 MW of capacity, operated by Vattenfall.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Highland (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | 6km north of Granton-on-Spey | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 25 Mar 2025 (permit ECU00001999, Electricity Act 1989 section 36, issued by Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 18 Oct 2022 (ref. ECU00001999, Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 25 Mar 2025 (granted, ref. ECU00001999, Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Vattenfall | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 50 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 57.4320, -3.5810 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Ourack is the 285th-largest of 872 power plants planned, permitted or under construction in Scotland and the 755th-largest of 3,222 in the United Kingdom by capacity; its 50 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 285th of 872 | 99,272 MW | <0.1% |
| United Kingdom | 755th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,832nd of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 55 substations and 52 grid connections (17 operating, 417 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Berry Burn Extension grid connection | Grid connection | 43.2 MW | Planned | 7.2 km |
| Corshellach BESS grid connection | Grid connection | 62.5 MW | Planned | 7.2 km |
| Berry Burn Extension Wind Farm grid connection | Grid connection | 19.4 MW | Planned | 7.2 km |
| Berryburn GSP | Substation | — | — | 8.1 km |
| Grantown Primary | Substation | — | — | 13 km |
| Ballindalloch Primary | Substation | — | — | 15 km |
Operator and place
More from Vattenfall
- Thanet (extension)340 MW
- Thanet300 MW
- South Kyle Wind Farm240 MW
- Pen Y Cymoedd228 MW
- Ormonde Offshore150 MW
- Aultmore Forest - Buckie - Windfarm106 MW · planned
- Ourack105 MW · permitted
- European Offshore Wind Deployment Centre (EOWDC) (Aberdeen Bay - Demonstration site)96.8 MW
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.