Power plant · West Lothian, Scotland, United Kingdom

Nettlehill Road - Solar Panels

Nettlehill Road - Solar Panels is a permitted solar power plant in West Lothian, Scotland, United Kingdom, with 2.8 MW of capacity, operated by Zestec Renewable Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWest Lothian (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address16 Nettlehill Road, Houstoun Industrial Estate, Livingston, EH54 5DLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date29 Feb 2024 (permit 0042/FUL/24, Town and Country Planning Act, issued by West Lothian)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date25 Jan 2024 (reference 0042/FUL/24, planning authority West Lothian)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Feb 2024 (granted, reference 0042/FUL/24, planning authority West Lothian)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorZestec Renewable Energy (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.9158, -3.5109DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority West Lothian, reference 0042/FUL/24)
  2. Permit applied for (planning authority West Lothian, reference 0042/FUL/24)

How it compares

Nettlehill Road - Solar Panels is the 697th-largest of 742 power plants planned, permitted or under construction in Scotland and the 2,208th-largest of 2,548 in the United Kingdom by capacity; its 2.8 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland697th of 74293,216 MW<0.1%
United Kingdom2,208th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,393rd of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 31 grid connections (10 operating, 129 MW), 14 data centers and 10 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Sungard Availability ServicesData center——4.8 km
Edinburgh SC-3Data center——6.5 km
Edinburgh SC-2Data center——13 km
Glendevon PrimarySubstation——33 km
Milnathort PrimarySubstation——35 km
Shire End 20MW PV grid connectionGrid connection20 MWPlanned39 km
Windburn Wind Farm 75MW Wind, 35MW BESS grid connectionGrid connection110 MWPlanned41 km
Dunblane PrimarySubstation——42 km
Highland Spring Group grid connectionGrid connection5.5 MWPlanned42 km

Operator and place

More from Zestec Renewable Energy

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page